Randolph & Briggs (part 4)
Well today I found out how far I can jam an x-acto knife into the palm of my hand … about half way. The blood letting slowed down the modeling today because I had to run to the pharmacy for butterfly bandages.
STEP 1: Top trim on the Corbels
i) Paint and glue the top trim pieces so they are flush with the inside of the top wall.
ii) Touch up with paint once dry
STEP 2: Assembly the billboard
i) remove all parts from their frets (take your time and be careful)
ii) glue the lattice framework to the solid board
iii) glue the legs onto the back frame (be sure they are set up straight)
iv) I’ll add a few pieces of trim to solidify the billboard later … after my palm heals!
You can also see I glued together the top stairwell and painted it blue. I also added the doors and windows to the remaining parts of the building.
Next Steps:
i) heal
ii) Complete the billboard
iii) assembly the fire escape
iv) apply the roofing
You can see how quickly it can come together .. I have less than 2 hours into each post (about 8 hours so far)
Joe
